Southline Roofing

Southline Roofing — Utah

This is how we do roofing.

Here's our full process — every step, before you decide anything. Three phases. Three proposals. All built around you.

See the process
Scroll

Request a Quote

You reach out. We come look at the roof and talk about what matters to you. Then you get three proposals — built around your priority.

One request
One visit
Three proposals
Discover your SOUTHLINE experience.
Step 01

Get in touch — your way.

Call, text, or fill out the form. Once we hear from you, we'll get back to you the same day and get you on our schedule.

Same-day reply

We get back to you the day you reach out. Not always within the hour — but that day.

No script, no pitch

When we call, we're not trying to sell you. We just want to understand what you need.

You pick the time

We'll offer a few options that work on our end — you choose what works on yours.

Step 02

30 min

On-site inspection

We look at the roof.
You tell us what you want.

We inspect the roof and then we talk — about what you actually want from this project. Longevity? Curb appeal? Affordable? That conversation shapes everything that comes after, including the estimate.

You choose where we focus.

Longevityhow long it lasts
Curb appealhow it looks from the street
Affordablewhat works for you
Step 03

You don't get one number.
You get three.

Three proposals, one direction. Different products, different price points — all built around the priority you chose.

±0%

margin of error

Real numbers. Eagle View Report.

We measure your roof with Eagle View — satellite data, exact dimensions. The number in your proposal isn't a guess. You'll see the same report we built it from.

Eagle View satellite overlay showing precise roof measurementsSatellite Measurement
Aerial view of a completed roof replacement

Every slope and plane of your roof, measured from satellite — before we build your quote.

You said your priority is

AffordableLongevityCurb appeal

Here are your three proposals

Architectural Shingles

Option 01Good

GAF Royal Sovereign® 3-Tab

20-year lifespan

Option 02Better

GAF Timberline HDZ®

25-year lifespan

Option 03Best

CertainTeed Landmark®

30-year lifespan

3 proposals

built around what you said

Exact dimensions

not a rough estimate

Line-by-line

breakdown, not a round number

The Fun Part.

You chose Southline. Now the fun part — you'll see your new roof before we build it, pick your colors, and lock in your build date.

Your design
Your colors
Your date
See what your roof will look like.
Step 01

Welcome to the SOUTHLINE experience.

You chose Southline. That's where the experience starts. We get everything lined up — and before we ever touch your roof, you'll get to see exactly what it's going to look like.

You'll see your roof before we build it

You pick the color — we show you how it actually looks

Nothing gets ordered until you're confident

We set the date together — you'll know exactly when your new roof starts

Step 02

See your new roof before we build it.

Using advanced imaging technology, we generate a full visual preview of your new roof on your actual home — before we order anything. Pick colors, compare styles, and make every decision with confidence.

2D renders

Interactive 3D

Real-time colors

Instant compare

Roof style 1Sample preview

Pick a style

Sample styles only — dozens more available when you request your estimate.

Part of how we work

We use advanced imaging to build an accurate model of your home — so you can see exactly what your new roof will look like before we build it.

Step 03

Locking the Date.

Once everything's picked, you get a specific install date — not a window of three weeks. We'll also tell you what to do the day before: mostly clearing the driveway and moving things away from the house. Nothing complicated.

If something changes on our end before your date, you'll hear from us — not the night before.

The Big Day.

The old roof comes off. The new one goes on. Here's what that day actually looks like.

Old roof out
New roof in
Done in 1–3 days
Time to build.

1–3

Days to complete

Step 01

Professional Build.

Fair warning: it's going to be loud for most of the day. The crew shows up early and gets started right away. We remove the old material and install the new system. Most jobs finish in a single day. If we find something unexpected underneath — like rotted decking — we stop and talk to you before doing anything extra. That means a conversation first, not a surprise charge at the end.

Crew arrives early, starts right away

Most roofs done in a single day

Unexpected issue? We talk first

No surprise charges — ever

Step 02

Meticulous Clean-Up.

We run magnets across your lawn and driveway after every single job. Nails are the part people actually worry about — they're hard to see and genuinely dangerous. We bag all the old material and haul it out. By the time we leave, the only thing that should look different is the roof.

✦ The magnet pass happens on every job, without exception.
Step 03

Your Roof Report.

Once everything's done, we put together a document with photos, materials used, warranty info, and the installation date. Most people tuck it away and forget about it — but it's there if you ever need to make an insurance claim or sell the house.

Photos

Photos of the finished installation — useful if you ever need to document a warranty claim.

Materials

Exact product names and specs — so you know precisely what's on your roof.

Warranties

Our workmanship coverage and the manufacturer's warranty document — both in writing.

Year & Details

Installation date and technical details — your insurance company or a future buyer will likely ask for this.

Southline

Ready to start your roof replacement?

We respond to every inquiry — usually the same day. If you're still comparing options, that's fine. No pressure either way.

Free estimateLicensed & insured24h responseLocal Utah team